Presented at GasTech Centre of Technical Excellence 23 March 2011
Martin Meyer, CB&I
On 18th June 2010 the first LNG cargo was shipped from the Peru LNG facility at Pampa Melchorita, South America's first LNG Liquefaction plant designed and constructed by CB&I at the lowest cost of any LNG export facility of its era. This presentation highlights some of the challenges of constructing Peru's largest ever industrial project including the impact of the remote location on labour supply, logistics and the need to create a totally self-sufficient facility and will also address the particular challenges posed by the unique characteristics of the jobsite including the site elevation and high seismicity.