Skip to main content

Late Life Gas Production Enhancement

Presented at AGM & Technical Meeting, 23 November 2017 at Hilton London Paddington Hotel, London by Reza Fallahi Alvani, Charlotte Wright , George Kontarakis, Petrofac Facilities Management Ltd
An Operator eager to maximise facility utilisation in a subdued price environment approached Petrofac to identify and develop production enhancement opportunities for a gas facility operating in late life. This paper looks at the schemes considered for production enhancement, resulting in the final recommendation of a phased approach to enhancing production based on an immediate export pipeline to shore packing pressure reduction, an intermediate flowing tubing head pressure (FTHP) reduction within the capabilities of the Production Compressor, and installation of a gas eductor to allow further FTHP reduction while eliminating the need for subsequent costly modifications to the Production Compressor and downstream processing and transportation facilities.
LogIn Required

Register or Log In

Please sign into your account before placing an order on our website.

User registration enables us to offer GPA Members discounts and to ensure you have a valid email address.

Your account details, content purchases, registrations and a record of your previous orders are accessible from your account.

Past Paper Download

Past Paper Download
Price
£50.00
Variations
Currency Selection

My Licences

You have not purchased any GPA Europe Membership yet. Visit our Membership area to select the Membership that is right for you and checkout.